Phillip Island Boat Ramp

Phillip Island Boat Ramp

  • Family Run
    Family Owned &
    Operated
  • Rapid Responses
    Rapid Response -
    24/7 365
  • Precision Equipments
    Latest Technology &
    Equipment
  • Commercial Civil Infrastructure
    Infrastructure, Major Projects, Civil, Rail & Marine Specialists
  • Servicing Australia wide
    Servicing
    Australia wide

Bridgewater Marine | Marine Infrastructure | Floor Shaving & Grooving

Boat ramps present a specific problem: a wet, sloping concrete surface that vehicles have to reverse down under load and drive back up while towing. Untreated, that surface offers very little for a tyre to grip.

Austral Contractors was engaged by Bridgewater Marine to cut a grooved anti-skid profile across the concrete ramp surface at Phillip Island. Using our floor shaver, we cut 20mm × 20mm grooves across more than 1,000 square metres of new concrete, running parallel to the direction of travel to give tyres a positive mechanical key on a surface that spends most of its life wet.

Floor shaving is the right tool for work at this scale. It cuts a clean, consistent profile in a single pass, removes material mechanically rather than chemically, and covers large areas quickly — critical on a marine site where tidal working windows and public access both constrain the program. The finished surface gives boat trailers and tow vehicles reliable traction across the full width of the ramp, in all conditions, for the life of the concrete.

Phillip Island Boat Ramp
  • Client: Bridgewater Marine
  • Industry: Marine
Service tags: Floor Shaving - Grooving

We Work With

Highbury Plumbing
Hutchinson Builders
John Holland Logo
Level Crossing Removal
Lux Precast Logo
West Gate Tunnel Project
Whelan The Wrecker
ACE Logo
ADJ Logo
Big Build Eastern Freeway
City Circle
CPB Contractors
Eastern Freeway Burke to Team Alliance
FDC Logo
FREDON Logo
Austral Contractors